Skip To Main Content

Roslyn Board of Education Tours District to Celebrate Exciting Campus Upgrades

Roslyn Board of Education Tours District to Celebrate Exciting Campus Upgrades

On Tuesday, August 26, 2025, members of the Roslyn Board of Education conducted their annual district-wide tour to review a series of recently completed campus improvements and to inspect that all schools were ready for students and staff.

The tour, led by Assistant to the Superintendent for Administration and Special Projects Thomas Szajkowski, kicked off at Roslyn High School with BOE President Meryl Waxman Ben-Levy, Vice President Michael Levine, Trustees David Dubner, Alison Gilbert, Robert Koonin, and David Seinfeld, along with Superintendent Allison Brown and Roslyn High School Principal Dr. Dave Lazarus.

Their first stop highlighted the exciting upgrades taking place across the high school campus, including new tennis courts, the ongoing construction of a brand-new baseball field complex to be completed in the late fall, and refinished gym floors. The tour also included a look at fresh sidewalks, tow staircases, a new staff walkway, and new auditorium curtains. The oil tank was also replaced.

BOE TOUR on TENNIS COURT

At East Hill Elementary School, the oil tank was replaced, new sidewalks and railings were installed, and the gym floor was refinished. Harbor Hill Elementary received an oil tank replacement, a new domestic water tank and a circulator pump in the boiler room, and refinished gym floors. The gym floors at Heights were also refinished, and the second floor of the building was renovated with new ceilings, lighting, new flooring, and a fresh coat of paint.

Projects at Roslyn Middle School included the replacement of the auditorium HVAC RTU compressor, a full renovation and abatement of the faculty room, and a complete renovation of Room 611. The library received new carpet, ceramic flooring, updated HVAC, and the relocation of bookcases, while both gym floors received a refreshed polyurethane finish. In addition, preparations were made for a new generator.

“These upgrades are an investment in our students and staff,” said Superintendent Allison Brown. “From the athletic fields to the classrooms to the library, the gym, and the auditorium, every improvement creates a more comfortable, modern, and inspiring space for teaching and learning. We are proud to continue enhancing our schools so they remain places where students can thrive.”